The Second Draft Report for NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, is now available. NFPA 25 is in the Annual 2016 revision cycle but the Second Draft Report was delayed due to balloting. As such, a revised deadline to submit a Notice of Intent to Make a Motion on this document is March 18, 2016.