Measures of engineering impact.

My engineering leadership circle met yesterday, and like usual, we talked about our current challenges before segueing into a deeper discussion. This time, Jack Danger brought up the challenge of measuring engineering impact, which is a fascinating topic that most engineering leaders have to tackle.

Measures of engineering impact are not Accelerate’s measures of developer productivity: lead time, batch size, failure rate, and time to revert. Those measures support understanding and optimizing y...

 •  0 comments  •  flag
Share on Twitter
Published on February 27, 2021 04:00
No comments have been added yet.