Goodreads Librarians Group discussion

6 views
Serieses! > Change order of Star Quest Trilogy by Ben Bova

Comments Showing 1-3 of 3 (3 new)    post a comment »
dateUp arrow    newest »

message 1: by David (new)

David | 18 comments This is above my comfort level as a librarian. I don't want to mess up something.

I hope this ends up in the right group.

The Star Quest trilogy is numbered incorrectly.
The correct order is
- Death Wave (#1)
- Apes and Angels (#2)
- Survival (#3)

They are listed as #2, #3, and #4, which is incorrect.
Amazon pages listed below for confirmation.
https://www.amazon.com/s?k=death+wave... (Book 1)
https://www.amazon.com/Apes-and-Angel... (Book 2)
https://www.amazon.com/Survival-Ben-B... (Book 3)


message 2: by Greg (new)

Greg | 9781 comments Done.


message 3: by David (new)

David | 18 comments Thank you.


back to top