Goodreads Librarians Group discussion

The Field Guide (The Spiderwick Chronicles, #1)
This topic is about The Field Guide
61 views
Book & Author Page Issues > change order of authors?

Comments Showing 1-20 of 20 (20 new)    post a comment »
dateUp arrow    newest »

message 1: by Sandra (new)

Sandra | 31494 comments I agree that normally would be the case. Not sure whether there is convention that the illustrator goes second? I'm assuming that Tony did the illustrations only, cause he has been known to write the text for some of his work as well.


message 2: by rivka, Former Moderator (new)

rivka | 45177 comments Mod
Neither is credited as the illustrator on the cover, or anywhere else I can see. Both are simply listed as authors.


message 3: by Sandra (new)

Sandra | 31494 comments OK, then Tony should go first according to the book covers.


message 4: by Sandra (last edited May 08, 2018 11:07PM) (new)

Sandra | 31494 comments Field Guide Companion book done. You can remove the pages you copied Corinne if you like.

Working on the 1st book ~ Field Guide, with 64 editions.


message 5: by Sandra (new)

Sandra | 31494 comments 1st book done.

I need a break, anyone else wants to jump in, welcome :)


message 6: by Hugo (last edited May 09, 2018 10:01AM) (new)

Hugo (hugo_nebula) | 740 comments Sandra wrote: "1st book done.

I need a break, anyone else wants to jump in, welcome :)"


Working on Book Two: The Seeing Stone.

Done!


message 7: by Hugo (last edited May 09, 2018 04:27PM) (new)

Hugo (hugo_nebula) | 740 comments Working on Book 3.

Done.


message 8: by Sandra (new)

Sandra | 31494 comments Excellent work Hugo :)

My back is playing up & I can't sit for long periods, so go for it!


message 9: by Hugo (new)

Hugo (hugo_nebula) | 740 comments Could someone with more experience than I have in parsing the Changelogs please have a look at this edition - https://www.goodreads.com/book/show/2...

I've added DiTerlizzi and made him the Primary, but the Cover and ISBNs are for a different book entirely.


message 10: by Hugo (new)

Hugo (hugo_nebula) | 740 comments Book four done.


message 11: by Abcdarian (new)

Abcdarian | 26579 comments 2-I, 2-II, 2-III and combinations 1-2 and 1-5 done, so "only" Book 5 left.


message 12: by Abcdarian (new)

Abcdarian | 26579 comments I've done Book 5, so the message 9 ones are left.


message 13: by Abcdarian (last edited May 11, 2018 06:28PM) (new)

Abcdarian | 26579 comments Companion Books Series done.

It's shocking how many editions didn't credit DiTerlizzi at all, in the regular and companion series.


message 14: by Sandra (new)

Sandra | 31494 comments Yes, I found that in the first book of the series, also.


message 15: by Abcdarian (new)

Abcdarian | 26579 comments Re #20: I changed the author order on those, but did not add them to series.

The Beyond series from post 9 is still mostly left. I can do it tonight if no one does meantime.


message 16: by Abcdarian (new)

Abcdarian | 26579 comments Beyond series done.


message 17: by Abcdarian (new)

Abcdarian | 26579 comments You're welcome. :-)


message 18: by Sandra (new)

Sandra | 31494 comments #25 Fixed the Slovenian edition but not sure why the 2nd part is showing Toni when its looks to have been Tony for some months, I switched the authors about a month ago & it had been Tony for some time even then.


message 19: by Sandra (new)

Sandra | 31494 comments LOL


message 20: by Scott (new)

Scott | 9147 comments Corinne wrote: "Needs to be switched
https://www.goodreads.com/book/show/4..."


Done


back to top