Don asked them how long they would run after a four-hour setup. Minimum a whole shift and usually much longer, was the consensus. And if there are not enough orders? After these questions nobody argued with the conclusion: to maximize their measurement of tons-per-hour, departments tend to process orders ahead of time and out of sequence in order to increase the batch size,