However, the engine was eventually mounted, and with Tsukada’s and Chindarkar’s assistance, custom piping, valves, fuel pumps, cold-gas thrusters, solar panels, and circuitry were fashioned to complete the robotic tug based on a CAD plan transmitted by Catalyst managers. Once the tug’s OS was loaded and diagnostics run, mission control declared it ready for use.