Here’s how I wrote down my hypothesis at the time: I hypothesize that by changing our Enterprise Kanban Board (EKB) to be a portfolio-level board, we can eliminate weekly status reports PM’s currently produce, thus reducing their administrative activities, which will save the department $150K annually, as measured by the time it takes 25 PMs to generate these reports. A colleague and I mocked up a “status-y looking” visualization on the Enterprise Kanban Board (EKB), leaving it intentionally roughlooking around the edges. The goal was to get feedback quickly, and not to have it perfect right