Recap 3: A signing and a move

A moment to back track:


When Nora and Ruth got up on Tuesday morning, a ceiling tile in their little kitchen/bar had fallen to the floor and water from the AC pipe was dripping everywhere. The hotel had engineering up to fix the tile and leak, but no one cleaned up the dirty floor. Housekeeping came back and cleaned the floor, then the leak started in the powder room off the kitchen and engineering had to come up again while we had dinner on the Riverwalk.


On Wednesday morning, all was fine ini...

2 likes ·   •  0 comments  •  flag
Share on Twitter
Published on August 07, 2014 06:55
No comments have been added yet.