How to deal with Power Outage for SmartHome Part 4

Here are the steps to get a 2 panel system up and running in a matter of minutes 1. Cut off both ends of SIMB 14/3 extension cable 2. Strip insulation back from 1/4″ on each wire 3. Connect black … Continue reading →
 •  0 comments  •  flag
Share on Twitter
Published on September 11, 2019 16:54
No comments have been added yet.