March 27th, 2018
Dear Daddy –
Aside from doing the joints and painting the walls, the blue bathroom is finished. All the plumbing and electrical are in place and working. I had a little snag this weekend, as I finished the electrical work. I once again had it rubbed in my face to check line voltage before putting in drywall. I think I get it now. Hopefully I won’t have to be reminded a third time.
You had left two wires dangling down from the attic, inside the wall on which the sinks were t...
Published on September 19, 2018 15:25