Just-In-Time PM V: The Iron Triangle

In Part IV, I introduced the idea of “intermediate packets.” Instead of delivering value in a big project that spans huge amounts of time, we want to deliver it in smaller chunks at more frequent intervals.


This follows a basic principle that has revolutionized many industries: small batch sizes.


The Toyota Production System (from which the term “just-in-time” is borrowed) used small batch sizes to revolutionize manufacturing, increasing the throughput of its factories far beyond what anyone thought possible. The tools and methods developed to enable small batch sizes propelled the company through 7 decades of growth, transforming a small bicycle shop into the world’s largest automaker.



To read this story, become a Praxis member.


Praxis


Praxis


You can choose to support Praxis with a subscription for $10 each month or $100 annually.


Click here to learn more about what's included in a Praxis membership.


Already a member? Sign in here.

 •  0 comments  •  flag
Share on Twitter
Published on May 20, 2018 11:17
No comments have been added yet.