It is the most extravagant infrastructure project in British history – but nobody can say why we need it. How did HS2 ever get so far?
Some time this summer, a piledriver should break ground outside Euston station in London. It will mark the start of the most extravagant infrastructure project in Britain’s history: High Speed 2, a railway line running 335 miles from London to Birmingham, Manchester, Sheffield and Leeds. The line is budgeted at 55bn, although late last year its cost was widely...
Published on June 06, 2016 22:00