|
Study of Elastomeric Shield Materials (ESM) for Apollo: February 5, 1963
by
0.00 avg rating — 0 ratings
|
|
|
Apollo Experience Report - Systems and Flight Procedures Development: September 1, 1973
by
0.00 avg rating — 0 ratings
|
|
|
Aero-Astrodynamics Considerations for the Apollo Telescope Mount: August 8, 1966
by
0.00 avg rating — 0 ratings
|
|
|
Apollo Experience Report - Engineering and Analysis Mission Support: July 1, 1975
by
0.00 avg rating — 0 ratings
|
|
|
Analysis of Apollo 10 Photography and Visual Observations: January 1, 1971
by
0.00 avg rating — 0 ratings
|
|
|
Space Processing Applications Rocket project (SPAR 1): Final Report: December 1, 1976
by
0.00 avg rating — 0 ratings
|
|
|
Assessment of the NASA AvSTAR Project Plan: July 30, 2004
by
0.00 avg rating — 0 ratings
|
|
|
Advanced Software Development Workstation Project: Phase 3 - Final Report: February 15, 1991
by
0.00 avg rating — 0 ratings
|
|
|
Apollo Infrared Acquisition and Tracking System, Summary Report: September 1, 1965
by
0.00 avg rating — 0 ratings
|
|
|
Project ECHO: Electronic Communications From Halo Orbit: January 1, 1994
by
0.00 avg rating — 0 ratings
|
|
|
Manned Geosynchronous Mission Requirements and System Analysis Study Extension. Manned Orbital Transfer Vehicle (MOTV) Capabilities Handbook and User Guide- Final report: February 1, 1981
by
0.00 avg rating — 0 ratings
|
|
|
Design Guide for Pitch-Up Evaluation and Investigation at High Subsonic Speeds of Possible Limitations Due to Wing-Aspect-Ratio Variations: August 1, 1959
by
0.00 avg rating — 0 ratings
|
|
|
User's Guide Large Area Crop Inventory Experiment (LACIE) Phase 3 PDP 11/45 Automatic Status and Tracking System: March 1, 1977
by
0.00 avg rating — 0 ratings
|
|
|
Test and Evaluation of Apollo 14 Composite Casting Demonstration Specimens 6, 9, and 12, Final Report: September 1, 1971
by
0.00 avg rating — 0 ratings
|
|
|
User Guide for the Digital Control System of the NASA/Langley Research Center's 13-Inch Magnetic Suspension and Balance System: March 1, 1987
by
0.00 avg rating — 0 ratings
|
|
|
NGSLR Safety Handbook: (February 1, 2015)
by
0.00 avg rating — 0 ratings
|
|
|
Sonic-Boom Ground-Pressure Measurements From Apollo 15: September 1, 1972
by
0.00 avg rating — 0 ratings
|
|
|
Aerodynamic Stability Characteristics of the Apollo Command Module: September 2, 2013
by
0.00 avg rating — 0 ratings
|
|
|
Guide to the Use of Data Collected by the NASA NP3A Aircraft in the BOMEX- June 2 and June 10,1969: September 1, 1970
by
0.00 avg rating — 0 ratings
|
|
|
A User's Guide for V174--A Program Using a Finite Difference Method to Analyze Transonic Flow Over Oscillating Wings: December 1, 1977
by
0.00 avg rating — 0 ratings
|
|
|
Test Facilities Capability Handbook: Volume 1 - Stennis Space Center (SSC); Volume 2 - Marshall Space Flight Center (MSFC): (January 1, 2007)
by
0.00 avg rating — 0 ratings
|
|
|
Final Report for A Study to Guide Research and Development Toward an Operational Meteorological Sounding Rocket System (Oct. 1966 - Apr. 1967): April 1, 1967
by
0.00 avg rating — 0 ratings
|
|
|
Site Remediation Technology InfoBase: A Guide to Federal Programs, Information Resources, and Publications on Contaminated Site Cleanup Technologies-First Edition: August 1, 1998
by
0.00 avg rating — 0 ratings
|
|
|
Mariner 9: Press Kit (October 22, 1971)
by
0.00 avg rating — 0 ratings
|
|
|
Mariner Mars 1969 Launches: (February 14, 1969)
by
0.00 avg rating — 0 ratings
|
|
|
Apollo 10 - Press kit (May 7, 1969)
by
|
|
|
Apollo 7 - Press Kit: (October 6, 1968)
by
|
|
|
Apollo Experience Report: Lunar Module Landing Gear Subsystem: (June 1, 1972)
by
0.00 avg rating — 0 ratings
|
|
|
Apollo 8 - Press Kit (December 6, 1968)
by
|
|
|
Orbiting Astronomical Observatory-C (OAO-C): Press kit: (August 17, 1972)
by
0.00 avg rating — 0 ratings
|
|
* Note: these are all the books on Goodreads for this author. To add more books,
click here.