|
System Analysis Approach to Deriving Design Criteria (Loads) for Space Shuttle and Its Payloads. Volume 1: General Statement of Approach: December 1, 1981
by
0.00 avg rating — 0 ratings
|
|
|
A Meteoroid Handbook for Aerospace Engineers and Managers: (December 1, 2019)
by
0.00 avg rating — 0 ratings
|
|
|
Structural Damage Prediction and Analysis for Hypervelocity Impacts: Handbook: (February 1, 1996)
by
0.00 avg rating — 0 ratings
|
|
|
ATS-E - Press Kit (August 10, 1969)
by
0.00 avg rating — 0 ratings
|
|
|
Tiros-M - Press Kit (January 7, 1970)
by
|
|
|
Engineering Analysis and Test Results of the Pre-stage Planetary Gear Trains for Wrist Rotation and Pitch Assembly and Azimuth and Elevation Assembly ... Manipulator Kit Assembly: November 12, 1973
by
0.00 avg rating — 0 ratings
|
|
|
Space Processing Applications Rocket Project: SPAR 2 - Final Report: November 1, 1977
by
0.00 avg rating — 0 ratings
|
|
|
Theoretical Flow Field Calculations for Project RAM: May 1, 1969
by
0.00 avg rating — 0 ratings
|
|
|
Flight Tests of a Supersonic Natural Laminar Flow Airfoil: December 1, 2015
by
0.00 avg rating — 0 ratings
|
|
|
USSR Space Life Sciences Digest: Volume 2 - No.1: March 1, 1981
by
0.00 avg rating — 0 ratings
|
|
|
Atmospheric Cloud Physics Laboratory Project Study: Final Report: June 22, 1976
by
0.00 avg rating — 0 ratings
|
|
|
Space Shuttle Earth Orbital Rendezvous Targeting Techniques for Near Circular Target Satellite Orbits: June 27, 1972
by
0.00 avg rating — 0 ratings
|
|
|
Mars Pathfinder Project: Planetary Constants and Models: December 1, 1995
by
0.00 avg rating — 0 ratings
|
|
|
Automated Flight Test Management System: May 1, 1991
by
0.00 avg rating — 0 ratings
|
|
|
Nacelle Aerodynamic and Inertial Loads (NAIL) Project: Final Technical Report: April 1, 1982
by
0.00 avg rating — 0 ratings
|
|
|
Advanced Turbine Technology Applications Project (ATTAP): 1993 Annual Report: July 1, 1994
by
0.00 avg rating — 0 ratings
|
|
|
Investigation of the Flight Characteristics of Free Flying Aerodynamically Shaped Balloons: Final Report: January 1, 1965
by
0.00 avg rating — 0 ratings
|
|
|
Project Fog Drops - Part 2: Laboratory Investigations: July 1, 1972
by
0.00 avg rating — 0 ratings
|
|
|
RL10A-3-3A Rocket Engine Modeling Project: January 1, 1997
by
0.00 avg rating — 0 ratings
|
|
|
Project Echo: 960-Megacycle, 10-Kilowatt Transmitter: October 1, 1961
by
0.00 avg rating — 0 ratings
|
|
|
A Review of the Physics of Comets and Its Experimental Investigation by an Instrumented Space Probe: February 22, 1963
by
0.00 avg rating — 0 ratings
|
|
|
Space Market Model Development Project: Phase 2 Report: June 1, 1988
by
0.00 avg rating — 0 ratings
|
|
|
The ABAG Biogenic Emissions Inventory Project: Final Report: September 1, 1982
by
0.00 avg rating — 0 ratings
|
|
|
Advanced Space Shuttle Simulation Model: April 1, 1982
by
0.00 avg rating — 0 ratings
|
|
|
Gas Dynamic Spray Technology Demonstration Project Management: Final Joint Test Report: June 30, 2011
by
0.00 avg rating — 0 ratings
|
|
|
Lunar Flight Study Series: Volume 3 - Earth to Moon Trajectory Investigation for Mission Profiles Involving a Lunar Parking Orbit: November 15, 1962
by
0.00 avg rating — 0 ratings
|
|
|
Low-cost Solar Array (LSA) Project: Project Quarterly Report - 9 (April 1978 - June 1978): June 1, 1978
by
0.00 avg rating — 0 ratings
|
|
|
Crustal Dynamics Project: Data Analysis - 1990: December 1, 1990
by
0.00 avg rating — 0 ratings
|
|
|
LSA Low-Cost Solar Array Project: Project Quarterly Report - 10 (July 1978 - September 1978): September 1, 1978
by
0.00 avg rating — 0 ratings
|
|
|
Advanced Turbine Technology Applications Project (ATTAP): 1991 Annual Report: June 1, 1992
by
0.00 avg rating — 0 ratings
|
|
* Note: these are all the books on Goodreads for this author. To add more books,
click here.