The application of Last Planner System in Construction Design > Editions
by Matteo Cremona
Published
by LAP Lambert Academic Publishing
Paperback, 0 pages
Author(s):
ASIN:
B00Q8CGMRY
Average rating:
0.0
(0 ratings)
Published December 20th 2013
by LAP LAMBERT Academic Publishing
Paperback, 132 pages
Author(s):
ASIN:
B0F26TMHHZ
Edition language:
English
Average rating:
0.0
(0 ratings)
Published December 20th 2013
by LAP LAMBERT Academic Publishing
Paperback, 132 pages
Author(s):
ISBN:
9783659507106
(ISBN10: 3659507105)
ASIN:
3659507105
Edition language:
English
Average rating:
0.0
(0 ratings)