There was the matter of cost, for example, about which he had not a clue. The size and type of materials he put in changed the cost of the project, it turned out. There was also the matter of aesthetics, the desires of a client who didn’t want a column standing in the middle of a floor, for instance, or blocking a particular sightline. “If engineers were in charge, every building would be a rectangular box,”