Most big projects are not merely at risk of not delivering as promised. Nor are they only at risk of going seriously wrong. They are at risk of going disastrously wrong
Think of the duration of a project as an open window. The longer the duration, the more open the window. The more open the window, the more opportunity for something to crash through and cause trouble, including a big, bad black swan.
From the dramatic to the mundane to the trivial, change can rattle or ruin a project—if it occurs during the window of time when the project is ongoing. Solution? Close the window.
Developing a clear, informed understanding of what the goal is and why—and never losing sight of it from beginning to end—is the foundation of a successful project.
One is a very short press release (PR) that summarizes what the new product or service is and why it is valuable for customers. The other is a “frequently asked questions” (FAQ) document with more details about costs, functionality, and other concerns. Bezos’s brainstorm was to make that last step in a conventional project the first step in Amazon projects.[11]
Whenever possible, planning should maximize experience, both frozen and unfrozen.
“Lost ground can always be regained—lost time never.”[28]
“A little neglect may breed great mischief.”