As always, if the project is not managed wisely, then the upsides can easily turn into downsides: • The pilot unit insists on customizing the concept too much to their specific needs. • Other units may feel alienated from the concept, as they were not part of designing it. • The short-term wins and anecdotal stories are too unit specific and hence not transferable to other units.

