Code Yellows are not generally called by engineering managers or directors because the scope of their field of influence should be small enough to manage the problem via other project management strategies. Code Yellows are for systemic problems; a problem that fits entirely within the domain of a single engineering manager without touching or affecting any other group is not systemic.