In 1944 the elevated trains stopped running over the bridge and the old iron terminal buildings were dismantled. A team of engineers began a painstaking examination of the entire structure to see what ought to be done about it. When they had concluded their studies two years later, it was announced that all the bridge needed was a new coat of paint.

