because of the alteration in the design the upper-walkway bolts were under about twice that load, estimated to have been 9,690 kilograms per bolt. This was more than the box beams could handle, so one of the bolts in the middle was ripped out. This meant that the remaining bolts were each bearing even more load, so they all failed in quick succession, causing the walkway to collapse.