When the Ministry of Energy in Moscow learned that the roof of the plant’s turbine hall had been covered with highly flammable bitumen, they ordered him to replace it. But the flame-retardant material specified for reroofing the structure—fifty meters wide and almost a kilometer long—was not even being manufactured in the USSR, so the Ministry granted him an exception, and the bitumen remained.