Steel and zirconium—essential for the miles of tubing and hundreds of fuel assemblies that would be plumbed through the heart of the giant reactors—were both in short supply; pipework and reinforced concrete intended for nuclear use often turned out to be so poorly made it had to be thrown away. The quality of workmanship at all levels of Soviet manufacturing was so poor that building projects throughout the nation’s power industry were forced to incorporate an extra stage known as “preinstallation overhaul.”