At their first planned maintenance shutdown, the Chernobyl operators found that the serpentine plumbing of the reactor was riddled with faults: the water-steam coolant pipes were corroded, the zirconium-steel joints on the fuel channels had come loose, and the designers had failed to build any safety system to protect the reactor against a failure of its feed-water supply—eventually, the Chernobyl engineers had to design and fabricate their own. Meanwhile, in Moscow, the reactor designers continued to discover further troubling flaws in their creation. In 1980 NIKIET completed a confidential