“a ‘change’ is any activity that is physical, logical, or virtual to applications, databases, operating systems, networks, or hardware that could impact services being delivered.”
Any improvement made after the bottleneck is useless, because it will always remain starved, waiting for work from the bottleneck. And any improvements made before the bottleneck merely results in more inventory piling up at the bottleneck.”
“The First Way helps us understand how to create fast flow of work as it moves from Development into it Operations, because that’s what’s between the business and the customer. The Second Way shows us how to shorten and amplify feedback loops, so we can fix quality at the source and avoid rework. And the Third Way shows us how to create a culture that simultaneously fosters experimentation, learning from failure, and understanding that repetition and practice are the prerequisites to mastery.”
“At the plant, I gave you one category, which was business projects, like Phoenix,” I say. “Later, I realized that I didn’t mention internal it projects. A week after that, I realized that changes are another category of work. But it was only after the Phoenix fiasco that I saw the last one, because of how it prevented all other work from getting completed, and that’s the last category, isn’t it? Firefighting. Unplanned work.”
“Remember, outcomes are what matter—not the process, not controls, or, for that matter, what work you complete.”
“Erik has helped me understand that there are four types of it Operations work: business projects, it Operations projects, changes, and unplanned work.
the four types of work: business projects, it Operations projects, changes, and unplanned work. Left unchecked, technical debt will ensure that the only work that gets done is unplanned work!”
“every work center is made up of four things: the machine, the man, the method, and the measures.
bill of resources. That’s the bill of materials along with the list of the required work centers and the routing. Once you have that, along with the work orders and your resources, you’ll finally be able to get a handle on what your capacity and demand is.
‘Improving daily work is even more important than doing daily work.’ The Third Way is all about ensuring that we’re continually putting tension into the system, so that we’re continually reinforcing habits and improving something. Resilience engineering tells us that we should routinely inject faults into the system, doing them frequently, to make them less painful.
“A critical part of the Second Way is making wait times visible, so you know when your work spends days sitting in someone’s queue—or worse, when work has to go backward, because it doesn’t have all the parts or requires rework.
a kanban board, among many other things, is one of the primary ways our manufacturing plants schedule and pull work through the system. It makes demand and wip visible, and is used to signal upstream and downstream stations.
everyone needs idle time, or slack time. If no one has slack time, wip gets stuck in the system. Or more specifically, stuck in queues, just waiting.”