The Kollam–Ernakulam metre gauge line runs over several bridges. When the metre gauge lines were replaced with broad gauge ones, the only major component of the track that had to be removed was the girders. He had constructed the bridges several decades ago, and in such a way that they were sturdy and durable enough to accommodate future developments.

