Start work on each theme with some version of a Design Studio or design sprint. (See Figure 7-4.) Depending on the scope of the hypothesis, the design sprint can be as short as an afternoon or as long as a week. You can do them with your immediate team but should include a broader group if it’s a larger-scale effort.

