In West Texas, the largest wind farm ever planned on American soil was abandoned in 2008 because the utility refused to build a high-voltage line out to the site. And the developer, the local oilman T. Boone Pickens, thought it was a travesty given how much he was investing to build the farm itself that he would be expected to also build the transmission infrastructure. He shelved the project after having installed just a thousand turbines, a fraction of the total.