On January 9, 1959, the world’s first purpose-built container crane went into operation, loading one 40,000-pound box every three minutes. At that rate, the Alameda terminal could handle 400 tons per hour, more than 40 times the average productivity of a longshore gang using shipboard winches. Similar cranes were installed in Los Angeles and Honolulu in 1960.20