An engineer interviewed said that the emphasis on cost cutting “permeates the fabric of the whole culture,” leading to a privileging of timing over quality, and a resistance to raising issues. No team wanted to be the group that lagged in efficiency or took too long to fix a problem on account of being overly cautious.