Delivering a product that was built to forecast to a customer consists of two simultaneous processes, each with a separate time cycle. A manufacturing flow must occur in which the raw material moves through various production steps and finally enters the finished goods warehouse, as illustrated below. Simultaneously, a salesman finds a prospect and sells to that prospect, who eventually places an order with the manufacturer.