Managerial productivity—that is, the output of a manager per unit of time worked—can be increased in three ways: 1. Increasing the rate with which a manager performs his activities, speeding up his work. 2. Increasing the leverage associated with the various managerial activities. 3. Shifting the mix of a manager’s activities from those with lower to those with higher leverage.