A passing green build means our changes have safely been integrated. A red build means the last change possibly did not integrate. You need to stop all further check-ins that aren’t involved in fixing the builds to get it passing again. If you let more changes pile up, the time it takes to fix the build will increase drastically. I’ve worked with teams where the build has been broken for days, resulting in substantial efforts to eventually get a passing build.

