They worked the graveyard shift, between midnight and five a.m., in teams of four: a “ropeman,” a “holeman,” and two “tubmen.” The team would affix lanterns at the edge of the cesspit, then remove the floorboards or stone covering it, sometimes with a pickax. If the waste had accumulated high enough, the ropeman and holeman would begin by scooping it out with the tub. Eventually, as more night soil was removed, the men would lower a ladder down and the holeman would descend into the pit and scoop waste into his tub.

