An engineer could only pull in new work if they had sufficient spare capacity, a status that was easy to determine by surveying how often their name came up on the wall. Overload became impossible. Not surprisingly, after switching to this more structured pull strategy, the total number of projects underway in the technology development group fell by almost 50 percent, while the rate at which projects were completed notably increased.
Slow Productivity: The Lost Art of Accomplishment Without Burnout