The high-value, high-risk features should be developed first. These features deliver the most value, and working on them eliminates significant risks. Next are the high-value, low-risk features. These features offer as much value as the first set, but they are less risky. Therefore, they can be done later in the schedule. Because of this, use the guideline to work first on high-value features, but use risk as a tie-breaker.