|
Application of Expert Systems in Project Management Decision Aiding: August 1, 1987
by
0.00 avg rating — 0 ratings
|
|
|
Optical Technology Apollo Extension System, Part 1 Summary Report: October 21, 1966
by
0.00 avg rating — 0 ratings
|
|
|
Project Space Shuttle - Data Bus Evaluation Laboratory: Test Report: January 1, 1975
by
0.00 avg rating — 0 ratings
|
|
|
TRIAD - Needs Analysis Supplement to the Final Report on a Preliminary Design of an Earth Resources Survey System: August 22, 1969
by
0.00 avg rating — 0 ratings
|
|
|
Apollo USB-System Multisignal Phase Modulation Problems and Solutions: April 21, 1965
by
0.00 avg rating — 0 ratings
|
|
|
Preliminary Flight Trajectories for the Apollo Soyuz Test Project: April 1, 1973
by
0.00 avg rating — 0 ratings
|
|
|
Apollo 13 Cryogenic Oxygen Tank 2 Anomaly: July 1, 1970
by
0.00 avg rating — 0 ratings
|
|
|
Apollo Experience Report - Command and Service Module Instrumentation Subsystem: August 1, 1973
by
0.00 avg rating — 0 ratings
|
|
|
MSFC Skylab Apollo Telescope Mount Experiment Systems Mission Evaluation: June 1, 1974
by
0.00 avg rating — 0 ratings
|
|
|
Bone Density and Calcium Balance Studies on Project Gemini: March 1, 1967
by
0.00 avg rating — 0 ratings
|
|
|
Data Management for Interdisciplinary Field Experiments: OTTER Project Support: November 1, 1993
by
0.00 avg rating — 0 ratings
|
|
|
Flat-Plate Solar Array Project - Final Repot Volume 5: Process Development: October 1, 1986
by
0.00 avg rating — 0 ratings
|
|
|
NPS Alternate TECHSAT Satellite: Design Project for AE-4871: January 1, 1993
by
0.00 avg rating — 0 ratings
|
|
|
Project FIRE: Instrumentation for Radiative Heating and Related Measurements: October 1, 1966
by
0.00 avg rating — 0 ratings
|
|
|
User's Operating Procedures - Volume 1: Scout Project Information Programs: July 1, 1985
by
0.00 avg rating — 0 ratings
|
|
|
Two-Gas Environmental Control for the Apollo Command Module: July 12, 1967
by
0.00 avg rating — 0 ratings
|
|
|
Full-Scale System Impact Analysis: Digital Document Storage Project - Final Report: March 12, 1989
by
0.00 avg rating — 0 ratings
|
|
|
Flat-Plate Solar Array Project - Volume 2: Silicon Material - Final Report: October 1, 1986
by
0.00 avg rating — 0 ratings
|
|
|
Implementation of a Production Ada Project: The GRODY Study: September 1, 1989
by
0.00 avg rating — 0 ratings
|
|
|
Project Tektite 1: A Multiagency 60-Day Saturated Dive: January 16, 1970
by
0.00 avg rating — 0 ratings
|
|
|
The ISIS Project: Fault-Tolerance in Large Distributed Systems - Semi-Annual R&D Status Report: July 1, 1990
by
0.00 avg rating — 0 ratings
|
|
|
Project LOCOST: Laser or Chemical Hybrid Orbital Space Transport: June 19, 1990
by
0.00 avg rating — 0 ratings
|
|
|
Flat-Plate Solar Array Project - Volume 1: Executive Summary: October 1, 1986
by
0.00 avg rating — 0 ratings
|
|
|
GEWEX America Prediction Project (GAPP) Science and Implementation Plan: September 1, 2004
by
0.00 avg rating — 0 ratings
|
|
|
Engineering, Technical, and Management Support Services for NASA Headquarters Office of Safety, Reliability, Maintainability and Quality Assurance ... Contract Summary Report: February 10, 1994
by
0.00 avg rating — 0 ratings
|
|
|
Recommended LOI Procedures for Hybrid Lunar Missions. Project Apollo: August 4, 1969
by
0.00 avg rating — 0 ratings
|
|
|
Monte Carlo Simulation for Apollo Go, No-Go Verification: February 1, 1967
by
0.00 avg rating — 0 ratings
|
|
|
Lunar Surface Engineering Properties Experiment Definition. Volume 2 - Lunar Soil Properties From Photographic Records, Final Report: January 1, 1970
by
0.00 avg rating — 0 ratings
|
|
|
Numerical Flow Field Prediction for Project RAM-C: June 30, 1966
by
0.00 avg rating — 0 ratings
|
|
|
Summary of Lightning Activities by NASA for the Apollo Soyuz Test Project: Supplement No. 1 to Apollo Soyuz Mission Evaluation Report: July 1, 1976
by
0.00 avg rating — 0 ratings
|
|
* Note: these are all the books on Goodreads for this author. To add more books,
click here.