|
Low Cost Solar Array Project Cell and Module Formation Research Area: Process Research of Non-CZ Silicon Material - Quarterly Report No. 2 June 1, 1982 - August 31,1982: January 1, 1981
by
0.00 avg rating — 0 ratings
|
|
|
Training of Korean Specialists: Phase 2 - Semiannual Report IITRI Project V6110 (June 22, 1970 - December 22, 1970): December 1, 1970
by
0.00 avg rating — 0 ratings
|
|
|
L-Band System Engineering - Concepts of Use, Systems Performance Requirements, and Architecture, Phase 2: Final Report: July 1, 2011
by
0.00 avg rating — 0 ratings
|
|
|
UAS Integration in the NAS Project: Flight Test 3 Data Analysis of JADEM-Autoresolver Detect and Avoid System: December 1, 2016
by
0.00 avg rating — 0 ratings
|
|
|
Final Project Report - Phase 1: Nondissipative DC to Dc Regulator-Converter Study (15 Jun. 1964 - 31 Dec. 1965): January 1, 1965
by
0.00 avg rating — 0 ratings
|
|
|
Human Operator Response to Error-Likely Situations in Complex Engineering Systems: August 1, 1988
by
0.00 avg rating — 0 ratings
|
|
|
Method of Adjoint Systems and Its Engineering Applications, Technical Note No. 1: October 10, 1964
by
0.00 avg rating — 0 ratings
|
|
|
Integrated Application of Active Controls (IAAC) Technology to an Advanced Subsonic Transport Project - Initial Act Configuration, Design Study: October 1, 1980
by
0.00 avg rating — 0 ratings
|
|
|
Nimbus II Flight Evaluation and Engineering Report, Launch Through Orbit 5275: February 1, 1969
by
0.00 avg rating — 0 ratings
|
|
|
A New Model Performance Index for the Engineering Design of Control Systems: December 9, 1968
by
0.00 avg rating — 0 ratings
|
|
|
Engineering Aspects of Control System Design via the ''Direct Method'' of Liapunov: December 1, 1966
by
0.00 avg rating — 0 ratings
|
|
|
Study of the Application of Planar Electroluminescent Panel Techniques: Final Project Report 13 Jun. 1966 - 13 Jan. 1967: "January 13, 1967 "
by
0.00 avg rating — 0 ratings
|
|
|
Crystallization Kinetics of Barium and Strontium Aluminosilicate Glasses of Feldspar Composition
by
0.00 avg rating — 0 ratings
|
|
|
CMG Assembly Life Test and Engineering Evaluation Test, M-509 Experiment: June 1, 1970
by
0.00 avg rating — 0 ratings
|
|
|
Fundamental Remote Science Research Program - Part 2: Status Report of the Mathematical Pattern Recognition and Image Analysis Project: August 1, 1984
by
0.00 avg rating — 0 ratings
|
|
|
The Flux and Source of Energetic Protons in Saturn's Inner Magnetosphere: December 1, 1982
by
0.00 avg rating — 0 ratings
|
|
|
Linear Systems Analysis Program, L224(QR). Volume 1: Engineering and Usage: December 1, 1979
by
0.00 avg rating — 0 ratings
|
|
|
Telecommunications and Data Acquisition Support for the Pioneer Venus Project: Pioneers 12 and 13, Prelaunch Through March 1984: July 1, 1984
by
0.00 avg rating — 0 ratings
|
|
|
Vertical Drop Testing and Analysis of the Wasp Helicopter Skid Gear
by
0.00 avg rating — 0 ratings
|
|
|
Evaluate the Application of Modal Test and Analysis Processes to Structural Fault Detection in MSFC - STS Project Elements: November 1, 1987
by
0.00 avg rating — 0 ratings
|
|
|
Applications Systems Verification and Transfer Project - Volume 5: Operational Applications of Satellite Snow-Cover Observations, Northwest United States: December 1, 1981
by
0.00 avg rating — 0 ratings
|
|
|
NASA Participation in the 1980 Persistent Elevated Pollution Episode/Northeast Regional Oxidant Study (PEPE/NEROS) Project: Operational Aspects: September 1, 1981
by
0.00 avg rating — 0 ratings
|
|
|
Space Shuttle Guidance, Navigation and Control Design Equations. Volume 2 - Preflight Through Orbit Insertion: April 15, 1971
by
0.00 avg rating — 0 ratings
|
|
|
An Experimental Study of Laser-Supported Plasmas for Laser Propulsion: Center Director's Discretionary Fund Project DFP-82-33 - Final Report: January 1, 1987
by
0.00 avg rating — 0 ratings
|
|
|
Final Supplemental Environmental Impact Statement for the Cassini Mission: July 3, 1997
by
0.00 avg rating — 0 ratings
|
|
|
Integrated Application of Active Controls (IAAC) Technology to an Advanced Subsonic Transport Project: Conventional Baseline Configuration Study - Final Report: June 1, 1980
by
0.00 avg rating — 0 ratings
|
|
|
GEOS-2 C-Band Radar System Project: Final Report - Spectral Analysis as Related to C-band Radar Data Analysis: October 1, 1972
by
0.00 avg rating — 0 ratings
|
|
|
A Microsoft Project-Based Planning, Tracking, and Management Tool for the National Transonic Facility's Model Changeover Process: December 1, 1998
by
0.00 avg rating — 0 ratings
|
|
|
The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration: December 1, 2000
by
0.00 avg rating — 0 ratings
|
|
|
Integrated Application of Active Controls (IAAC), Technology to an Advanced Subsonic Transport Project: Demonstration Act System Definition - Final Report: August 1, 1982
by
0.00 avg rating — 0 ratings
|
|
* Note: these are all the books on Goodreads for this author. To add more books,
click here.