Regular readers will recall the
side building renovation project I embarked upon last summer. This is what the dilapidated building looked like after I removed the roof and began working on it.

Anyway, I picked away at the finishing touches over the summer and can now happily report that the project is 98% complete thanks to the help of my son who assisted in crucial areas like painting the doors.
My father worked on the project with me last summer, and my wife lent a helping hand with the exterior render this June, so all in all, the side building project turned out to be a real family effort.
As I mentioned above, it's not totally done yet, but should be soon. I am quite satisfied with the way the building is turning out. I'll post some "final product" photos when I have them.
My son is also a great help with the hens. He has assumed the post of "chicken egg transfer engineer", a critical position that includes the hefty responsibility of collecting the eggs from the hen house and bringing them into the house every morning.
Published on August 21, 2022 09:31